ROUTE OF CARNIVAL SUBMARINE NETWORKS - 1 & 2

The CSN-1 system will consist of two segments: the main trunk of 4,500 km will connect Naples (Florida, USA), Playa Diablillo (Panama), Costa del Este (Panama), and Anconcito (Ecuador). It will have between 12 and 17 fiber pairs from the Naples area in US to Costa del Este, and eight fiber pairs from Costa del Este to Anconcito, each with a design capacity of approximately 20 Tbps using current technology.

The Colombia Branch of 525 kilometers will connect Salgar/Barranquilla (Colombia) with a branch on the main trunk. It will have four fiber pairs, each with a design capacity of approximately 20 Tbps using current technology.

The CSN-2 cable system will be approximately 1,700km long, linking Veracruz in Mexico to the Apalachee Beach zone in northern Florida.

About Us

TELCONET LATAM
At Telconet Group, our Vision is to integrate Ecuador into the world through the early adoption of the most advanced IT and telecommunications technologies. We strive for excellence by anticipating future trends and the needs of our communities and clients. In 2002 Telconet Latam built the largest Fiber Optic Network and in 2012 the first Tier III and Tier IV Data Centers in Ecuador.
 
CARNIVAL SUBMARINE NETWORKS -1
In 2015, we ensured availability and diversity in the country's submarine connectivity with the deployment of the PCSS Submarine Cable. In 2016, we secured the provision of fiber optic cable for our network deployment by building the largest factory of fiber optic cable in South America, which now operates at full capacity and exports to several countries in the Americas and Europe. In 2017, we expanded our operation to other countries, and in 2020 we were among the first operators in the world to incorporate NVIDIA technology.

In 2022, we began the deployment of the CSN-1 Submarine Cable, a project designed to meet the future needs of international connectivity and redundancy for our clients in Ecuador, significantly expanding the international outbound capacity for countries such as Panama and Colombia, with a state-of-the-art multi-fiber submarine cable.

We believe that future results will once again be the reward for our trust in Ecuador and the region and for all the challenges we have undertaken.

CARNIVAL SUBMARINE NETWORKS-2

Telconet will develop a new submarine cable between Veracruz, Mexico, and the Apalachee Beach area in northern Florida, USA. The deployment of the CSN-2 will occur alongside the extension of the CSN-1 to Cancún, from the BU reserved for such purposes

Contáctenos

CSN-1 MILESTONES

DRG Chosen as Project Manager / January 2021

Elección DRG como Project Manager / Enero 2021

DRG Undersea Consulting Inc. is a consulting group with over 30 years of experience in the telecommunications industry, specializing in the planning, engineering, construction management, operation, and commercialization of submarine fiber optic telecommunications infrastructure worldwide.

This expertise, combined with their complementary knowledge of terrestrial networks for critical backhaul installations in submarine and national backbone networks, along with a team renowned for its broad perspective and deep experience, led Telconet to select DRG as advisors and Project Manager for CSN-1 in January 2021.